Procedure for Notification, Prior Consultation Proposed Xayaburi Dam Project-Mekong River Prior Consultation Project Review Report

DOI
10.52107/mrc.ajhyl3
Title
Procedure for Notification, Prior Consultation Proposed Xayaburi Dam Project-Mekong River Prior Consultation Project Review Report
Author
MRC
Abstract

This Report highlights a number of areas of uncertainty on which further information is needed to address possible transboundary impacts of the proposed Xayaburi hydropower project.

Publication Date
Publisher
Language
English
Categories
Keywords
Access
File Size
File not found. Download
Preview

Share

Cite as

MRC. (2022). Proceedings of the 1st ASEAN-MRC Water Security Dialogue: Solutions for a Changing Region. Vientiane: MRC Secretariat. https://doi.org/10.52107/mrc.ajutqy

Copy citation to clipboard

© 2024 Mekong River Commission

Mr. Yasunobu Matoba

Former Chief Executive Officer (CEO) of the Mekong River Commission (MRC) Secretariat 

Dr. Olivier Cogels

Former Chief Executive Officer (CEO) of the Mekong River Commission (MRC) Secretariat 

Mr. Kristensen Joern

Former Chief Executive Officer (CEO) of the Mekong River Commission (MRC) Secretariat 

Mr. Jeremy Douglas BIRD

Former Chief Executive Officer (CEO) of the Mekong River Commission (MRC) Secretariat 

Mr. Hans Joakim GUTTMAN

Former Chief Executive Officer (CEO) of the Mekong River Commission (MRC) Secretariat 

Mr. Pham Tuan Phan

First Riparian Chief Executive Officer (CEO) of the Mekong River Commission (MRC) Secretariat

Dr. An Pich Hatda

Former Chief Executive Officer (CEO) of the Mekong River Commission (MRC) Secretariat