Technical Review Report on Prior Consultation for the Luang Prabang Hydropower Project

DOI
10.52107/mrc.ajg3u2
Title
Technical Review Report on Prior Consultation for the Luang Prabang Hydropower Project
Author
MRC
Abstract
The report was prepared to support the prior consultation process for the proposed Luang Prabang hydropower project. It provides a scientific review of the documentation submitted to the MRC by the Lao National Mekong Committee, covering hydrology and hydraulics, sediment and geomorphology, water quality and aquatic ecology, fish passage and fisheries, navigation, dam safety, and socio-economic aspects.
Publication Date
Publisher
MRC Secretariat
Categories
Reports Technical Paper Series
Keywords
MRC Procedures
Access
Open Access
Copyright
MRC
License
Creative Commons Attribution–NonCommercial 4.0

Share

Cite as

MRC. (2020). Technical Review Report on Prior Consultation for the Luang Prabang Hydropower Project. Vientiane: MRC Secretariat. https://doi.org/10.52107/mrc.ajg3u2

Copy citation to clipboard