Council Study Team Site
Proposed Council Study Implementation Schedule (Presented during the 22nd MRC Council Meeting, 13 January 2016)
Alternative Schedule for Consideration (Presented to 4th RTWG Meeting, 10 March 2015 and JC Preparatory Meeting, 5 May 2015)
Overall Schedule (updated 10-Feb-15)
List of Key Events (updated 1 March 2016)
Date | Venue | Event | Note |
---|---|---|---|
14 November 2014 | OSV, Vientiane, Lao PDR | 3rd RTWG Meeting | Topics: Team work plans and approach |
12-13 November 2014 | OSV, Vientiane, Lao PDR | Startup Workshop | Start of the CS Implementation Phase |
3-4 February 2015 | Hanoi, Viet Nam | TACT Meeting, Hanoi Viet Nam | Discuss CS Modeling Approach |
18-28 March 2015 | Delta and Tonle Sap | Field Visits/Assessments | Biological Resources Expert Team |
10 March 2015 | OSV, Vientiane, Lao PDR | 4th RTWG Meeting | - |
21 April 2015 | OSP, Phnom Penh, Cambodia | Small Technical Work Group Meeting, OSP | Topics: Baseline hydrologic period and detailed modeling approach |
5 May 2015 | Siem Reap, Cambodia | 41s JC Preparatory Meeting | Council Study Progress Report Presentation |
13 May 2015 | OSV, Vientiane, Lao PDR | Internal Kickoff Meeting: Formulation of Development Scenarios | Topic: Cumulative Development Scenarios and Thematic Sub-scenarios: Work Plan, Context, Guidance, Approach |
22 – 26 June 2015 | OSP, Phnom Penh, Cambodia | IKMP – BioRA Coordination/Working Sessions (at OSP) | Topic: Discuss modeling output required for the development of response curves |
24 June 2015 | OSV, Vientiane, Lao PDR | Informal Development Partner Meeting | Council Study Progress Report Presentation |
29 June – 3 July 2015 | OSP, Phnom Penh, Cambodia | Knowledge Capture Workshops – Vegetation and Geomorphology (at OSP) | Initial development of response curves for geomorphology and vegetation disciplines by national and international discipline specialists |
3 – 13 July 2015 | OSV, Vientiane, Lao PDR | BioRA Knowledge Capture Workshop (KCW) Technical Work Sessions | Replaced the Field Visit Part 2 |
14 July 2015 | Bangkok, Thailand | 11th TACT Meeting |
First Day Topics – Council Study Modeling Approach and Baseline Selection |
13-14 August 2015 | Siem Reap, Cambodia | 5th RTWG Meeting |
Topics: Implementation Schedule Extension and Progress Updates: - Baseline Modeling |
20 August 2015 | Hanoi, Viet Nam | WUP-FIN Technical Meeting | Modeling Team and Participants from Cambodia, Thailand, Viet Nam (Meeting with Lao PDR on another date) |
25 August 2015 | OSV, Vientiane, Lao PDR | 42nd JC Preparatory Meeting, OSV | Council Study Progress Report Presentation |
14-26 September 2015 | OSV, Vientiane, Lao PDR | Work Planning Workshop – Socio Economic Assessment | Topics: Develop detailed work plan, framework and methodology for CS socio-economic assessment work |
17-24 September 2015 | OSP, Phnom Penh, Cambodia | BioRA KCW/Technical Work Sessions | BioRA Team National and International Specialists, MRCS Technical Staff (EP and FP), and NMCs |
21-25 September 2015 | OSP, Phnom Penh, Cambodia | Hydropower Thematic Team Coordination Meetings | International Consultants (CS and ISH 0306) and Modeling Team |
24 September 2015 | OSV, Vientiane, Lao PDR | WUP-FIN Meeting | Modeling Team and Lao PDR |
24 September 2015 | OSV, Vientiane, Lao PDR | Socio-Economic/Macroeconomic Assessment Workshop – Scoping and Methodology | Socio-Economic/Macroeconomic Assessment Team International/National Consultants, Programmes, and MCs |
6 October 2015 | OSV, Vientiane, Lao PDR | Regional Technical Meeting of the Domestic and Industrial Water Use Team for Formulation of Development Scenarios | Domestic and Industrial Water Use Team and MCs |
26-27 October 2015 | Bangkok, Thailand | Irrigation/Land Use Change National Consultation – Thailand | Irrigation/Land Use Change Thematic Teams National Consultants and MCs |
21-23 October 2015 | Phnom Penh, Cambodia | Mekong Forum on Water, Food, and Energy, Phnom Penh | Council Study Presentation within Overall MRC Presentation |
26-27 November 2015 | Thalat, Lao PDR | Irrigation/Land Use Change National Consultation – Laos | Irrigation/Land Use Change Thematic Teams National Consultants and MCs |
6-7 November 2015 | Siem Reap, Cambodia | Irrigation/Land Use Change National Consultation – Cambodia | Irrigation/Land Use Change Thematic Teams National Consultants and MCs |
12-13 November 2015 | Ho Chi Minh, Viet Nam | Irrigation/Land Use Change National Consultation – Viet Nam | Irrigation/Land Use Change Thematic Teams National Consultants and MCs |
4 November 2015 | Ho Chi Minh, Viet Nam | Flood Protection Regional Meeting on Development Scenarios | Flood Thematic Team |
12 November 2015 | OSV, Vientiane, Lao PDR | Regional Technical Meeting on Reference Scenario and Reference Period | 2 Participants from each MC and Modeling Team |
27 November 2015 | Sihanoukville, Cambodia | National Consultation of Cambodia on BioRA Results | - |
17-18 December 2015 | Phnom Penh, Cambodia | 6th RTWG Meeting | Topic: Presentation and approval of Development Scenarios |
15-19 February 2016 | OSP, Phnom Penh, Cambodia | BioRA Technical Workshop | Dissemination of Interim Reports/Results, Testing of BioRA DSS, and Hands-on Experience |
Technical Document Deliverables and Selected Council Study Presentations
Council Study Progress Update Presentations During Council and JC Meetings
Document | Date |
---|---|
Council Study Progress Presentation |
21st MRC Council Meeting |
Council Study Progress Presentation |
41st MRC JC Meeting |
Council Study Progress Presentation |
42nd MRC JC Meeting |
Council Study Progress Presentation |
22nd MRC Council Meeting |
Council Study Progress Presentation |
43rd MRC JC Meeting |
2nd RTWG Meeting, 11-12 September 2014, Phnom Penh, Cambodia
Document | Date |
---|---|
Draft Agenda 2nd RTWG meeting.pdf | 11-12 September 2014 |
DRAFT Meeting Notes of the 2nd RTWG Meeting | 11-12 September 2014 |
List of participants 2nd RTWG.pdf | 11-12 September 2014 |
Start-up Workshop/3rd RTWG Meeting, 12-14, October 2014, Vientiane, Laos
Document | Date |
---|---|
Draft Final Agenda Startup Meeting November 12-14 2014.pdf | 12-14 November 2014 |
Briefing Notes Package - Council Study Startup Workshop and 3rd RTWG Meeting - v2 clean.pdf | 12-14 November 2014 |
3rdRTWG Meeting Notes-15-12-2014rev.pdf | 14 November 2014 |
Comparison of Environmental Flow Assessment Tools Including DRIFT.pdf | November 2014 |
18 - Day 1 Recap | 12-14 November 2014 |
19 - Day 2 Recap | 12-14 November 2014 |
RTWG010 - Recap | 12-14 November 2014 |
4th RTWG Meeting, 10 March 2015, Vientiane, Laos
Document | Date |
---|---|
Draft 4th RTWG Meeting Notes | 7 April 2014 |
Draft Agenda | 10 March 2014 |
Briefing Notes Package | 3 March 2015 |
Briefing Notes Package Attachment 1 – Concept Note: Formulation and Assessment of Development Scenarios | 3 March 2015 |
Briefing Notes Package Attachment 2 – TACT- Approved Modeling Approach for the Council Study | 3 March 2015 |
Briefing Notes Package Attachment 3 – eWater | 3 March 2015 |
Powerpoint Presentations | |
Agenda - Revised | 10 March 2015 |
Overall Progress | 10 March 2015 |
Scoping of the formulation and assessment of development scenarios | 10 March 2015 |
Progress of Modelling Team Support to the Council Study | 10 March 2015 |
Biological Resources Assessment - Overview & Progress | 10 March 2015 |
Economic and social assessments | 10 March 2015 |
Climate Change Scenarios for the Council Study | 10 March 2015 |
Review of Comments from 3rd RTWG Meeting | 10 March 2015 |
Challenges and Next Steps | 10 March 2015 |
List of Participants | 10 March 2015 |
Draft Final Meeting Notes | 15 May 2015 |
Biological Resources Assessment (BioRa) Preparatory Pre-and Post-Field Visit Meetings, 19-28 March 2015
BioRA Technical Working Sessions/Knowledge Capture Workshops, 4 – 11 July, OSV
Document | Date |
---|---|
Draft Agenda | 4 July 2015 |
BIoRA National Counterparts Catch-Up Session | 5 July 2015 |
BioRA Introduction | 6 July 2015 |
Geomorphology Background and Progress | 6 July 2015 |
Geomorphology Status and Trends | 6 July 2015 |
Vegetation Background and Progress | 6 July 2015 |
Vegetation Status and Trends | 6 July 2015 |
Fish Background, Progress, and Status and Trends | 6 July 2015 |
Invertebrates Background, Progress, and Status and Trends | 6 July 2015 |
Herptiles Background and Progress | 6 July 2015 |
Herptiles Status and Trends | 6 July 2015 |
Birds and Mammals Background and Progress | 11 July 2015 |
Birds and Mammals Status and Trends | 6 July 2015 |
Next Steps | 6 July 2015 |
Small Technical Workgroup Meeting, 21 April 2015, OSP, Phnom Penh
Document | Date |
---|---|
Draft Agenda | 21 April 2015 |
List of Participants (MRCS) | 21 April 2015 |
List of Participants (NMCs) | 21 April 2015 |
Technical Note – Hydrological Baseline | 24 March 2015 |
Working Paper – Baseline Selection for the Council Study Modelling Support | 14 April 2015 |
Modelling Framework for the Council Study | 13 April 2015 |
Internal Kickoff Meeting on Formulation of Development Scenarios, 13 May 2015, OSV, Vientiane, Lao PDR
Document | Date |
---|---|
Draft Agenda | 13 May 2015 |
List of Participants (MRCS) | 13 May 2015 |
Reference Document: Simulated Hydrological Changes of Basin-Wide Development Scenarios | December 2009 |
Reference Document: Scoping and Planning of the Assessment of Basin-Wide Development Scenarios | 23 March 2009 |
Presentation: Context and Overall Guidance | 13 May 2015 |
Presentation: BDP2 Experience in Formulating Development Scenarios | 13 May 2015 |
Discussion Material: Development Scenarios and Thematic Sub-scenarios | 13 May 2015 |
Presentation: Design of the Development Scenarios for the Thematic Area Navigation | 13 May 2015 |
Presentation: Land Use Change Scenarios | 13 May 2015 |
Draft Meeting Notes | 13 May 2015 |
Draft Schedule Formulation of Development Scenarios | 13 May 2015 |
BioRA DSS (DRIFT) Installation Files (Updated 29 January 2016)
File | Date | Note |
---|---|---|
Readme Version and Installation | 24 April 2015 | Briefly explains how to install DRIFT or update previously installed versions of DRIFT |
DRIFT | 24 April 2015 | Zipped file which should be unzipped into C:\DRIFT\Bin folder to update previously installed DRIFT |
Drift2_v2.38t6 | 24 April 2015 | Zipped file used for new installation |
Drift2_v2.54 | 28 Julyl 2015 | Latest version: Zipped file used to update installation |
DRIFT Update Instruction | 28 July 2015 | Latest version: Briefly explains how to install DRIFT or update previously installed versions of DRIFT |
Drift_v2.69 | 2 November 2015 | Latest version: Zipped file used to update installation |
Drift_v2.72 | 30 November 2015 | Latest software version: Zipped file. Unzip into /Bin folder |
BioRA DSS Package (zip file) | 29 January 2016 | Latest software version v2.74m, BioRA DSS Master Database, and BioRA Notes for Operating DRIFT |
Follow the link for the latest DRIFT update https://www.dropbox.com/sh/ir56l5ni5z8mxtl/AABlaonRJ3fMPOkCS1Ke4-mya?dl=0 |
5th RTWG Meeting, 13-14 August 2015, Siem Reap, Cambodia
Mini-Workshop on the Social and Economic Assessment Approach and Methodology for the Council Study, 24 September 2015, OSV, Vientiane, Lao PDR
Document | Date |
---|---|
Agenda | 24 September 2015 |
Introduction and Overview | 24 September 2015 |
Economic Assessment Approach and Methodology | 24 September 2015 |
Social Assessment Approach and Methodology | 24 September 2015 |
Small Technical Workgroup Meeting, 12 November 2015, OSV, Vientiane, Lao PDR
Document | Date |
---|---|
Draft Agenda | 12 November 2015 |
Reference Period and Reference Scenario | 12 November 2015 |
Modelling Progress Status Update | 12 November 2015 |
BioRA - Modelling Coordination | 12 November 2015 |
Schedule and Next Steps | 12 November 2015 |
6th RTWG Meeting, 17-18 December 2015, Phnom Penh, Cambodia
BioRA Technical Workshop, 15-19 March 2016, Phnom Penh, Cambodia
Literature Review - Priority MRC Documents
Adamson P 2010 Hydrological Significance, Mekong River Commission, Vientiane, Lao PDR
BDP 2004 The application of the RAOM to economic analysis of water use trade offs within the BDP, Mekong River Commission, Phnom Penh, Cambodia
Cross 2004 Hydrologic Analysis for Basin Planning using the MRC DSF Spatial flood relationships to river flows dai fish catches & inundated populations, Mekong River Commission, Phnom Penh, Cambodia
Grill G Ariwi G and Lehner B 2012 ecosystem fragmentation in Significant Tributaries, Mekong River Commission, Vientiane, Lao PDR
Halcrow 2003 Final Report on the Development of the BDP RAOM, Mekong River Commission, Phnom Penh, Cambodia
Hart etal 2001 Transboundary Water Quality in the MRB, Mekong River Commission, Phnom Penh, Cambodia
Hatfield 2010 Review of Streams and Catchments data, Mekong River Commission, Vientiane, Lao PDR
Hatfield 2010 Stream and Catchment Generation, Mekong River Commission, Vientiane, Lao PDR
Hortle, K.G. (2013) Mitigation of the impacts of dams on fisheries - a primer. Mekong Development Series No. 7. Mekong River Commission, Vientiane Lao PDR. 74 pages, Mekong River Commission, Vientiane, Lao PDR
ICEM 2010 Strategic Environmental Assessment of Hydropower on the Mekong Mainstream Final Report, Mekong River Commission, Vientiane, Lao PDR
ICEM 2010 Strategic Environmental Assessment Of Hydropower On The Mekong Mainstream Avoidance Enhancement And Mitigation Assessment, Mekong River Commission, Vientiane, Lao PDR
ICEM 2010 Strategic Environmental Assessment Of Hydropower On The Mekong Mainstream Br1-Economics-Baseline-Assessment, Mekong River Commission, Vientiane, Lao PDR
ICEM 2010 Strategic Environmental Assessment Of Hydropower On The Mekong Mainstream Br2-Energy-And-Power-Baseline-Assessment, Mekong River Commission, Vientiane, Lao PDR
ICEM 2010 Strategic Environmental Assessment Of Hydropower On The Mekong Mainstream Br4-Aquatic-Theme-Baseline, Mekong River Commission, Vientiane, Lao PDR
ICEM 2010 Strategic Environmental Assessment Of Hydropower On The Mekong Mainstream Br5-Fisheries-Baseline-Assessment, Mekong River Commission, Vientiane, Lao PDR
ICEM 2010 Strategic Environmental Assessment Of Hydropower On The Mekong Mainstream Br6-Social-Theme-Baseline, Mekong River Commission, Vientiane, Lao PDR
ICEM 2010 Strategic Environmental Assessment Of Hydropower On The Mekong Mainstream Br8-Summary-Baseline, Mekong River Commission, Vientiane, Lao PDR
ICEM 2010 Strategic Environmental Assessment Of Hydropower On The Mekong Mainstream Impacts Assessment Report Opportunities And Risks, Mekong River Commission, Vientiane, Lao PDR
ICEM 2010 Strategic Environmental Assessment Of Hydropower On The Mekong Mainstream Inception Report Volume 1, Mekong River Commission, Vientiane, Lao PDR
ICEM 2010 Strategic Environmental Assessment Of Hydropower On The Mekong Mainstream Inception Report Volume 2, Mekong River Commission, Vientiane, Lao PDR
Jirayut 2007 SWAT Model Application for Erosion and Sedimentation of Lower Mekong River Basin, Mekong River Commission, Vientiane, Lao PDR
Jirayut and Trung 2005 DSF The Transboundary Analysis tool developed by MRC
Koehnken L 2012 Potential Sediment Contribution in the Lower Mekong River Basin, Mekong River Commission, Vientiane, Lao PDR
Koponen etal 2009 Productivity and fisheries report, Mekong River Commission, Vientiane, Lao PDR
Kummu etal 2009 DMS Detailed modelling support Project, Mekong River Commission, Vientiane, Lao PDR
Meynell PJ 2012 Ecological significance paper V1, Mekong River Commission, Vientiane, Lao PDR
Meynell PJ 2012 Ecological significance V2, Mekong River Commission, Vientiane, Lao PDR
MRC 2013 ISH11 Phase 2 Aquatic Ecology Annex 20 Dec 2013, Mekong River Commission, Vientiane, Lao PDR
MRC 2013 ISH11 Phase 2 Fisheries Annex 20 Dec 2013, Mekong River Commission, Vientiane, Lao PDR
MRC 2013 ISH11 Phase 2 Hydrology Annex 20 Dec 2013, Mekong River Commission, Vientiane, Lao PDR
MRC 2013 ISH11 Phase 2 Sediment & Geomorphology Annex 20 Dec 2013, Mekong River Commission, Vientiane, Lao PDR
MRC 2013 ISH11 Phase 2 Socio-Economics Annex 20 Dec 2013, Mekong River Commission, Vientiane, Lao PDR
MRC 2013 ISH11 Phase 2 Water Quality Annex 20 Dec 2013, Mekong River Commission, Vientiane, Lao PDR
MRC 2011 PNCPA Proposed Xayaburi dam project Annex-2-List-References-Documents-Draft, Mekong River Commission, Vientiane, Lao PDR
MRC 2011 PNCPA Proposed Xayaburi dam project Annex1A-PC-Road-Map, Mekong River Commission, Vientiane, Lao PDR
MRC 2011 PNCPA Proposed Xayaburi dam project Annex1B-LaoPDR-Statement-PNPCA, Mekong River Commission, Vientiane, Lao PDR
MRC 2011 PNCPA Proposed Xayaburi dam project Annex1C-International-Regional-MRCS-Experts, Mekong River Commission, Vientiane, Lao PDR
MRC 2011 PNCPA Proposed Xayaburi dam project Annex3-Sediment-Expert-Group-Report, Mekong River Commission, Vientiane, Lao PDR
MRC 2011 PNCPA Proposed Xayaburi dam project Annex4-Fisheries-Expert-Group-Report, Mekong River Commission, Vientiane, Lao PDR
MRC 2011 PNCPA Proposed Xayaburi dam project Annex5-Safety-of-Dams, Mekong River Commission, Vientiane, Lao PDR
MRC 2011 PNCPA Proposed Xayaburi dam project Annex6-Navigation-Assessment-Report, Mekong River Commission, Vientiane, Lao PDR
MRC 2005 Scenarios for strategic planning, Mekong River Commission, Vientiane, Lao PDR
MRC 2005 Strategic directions for IWRM in the LMB, Mekong River Commission, Vientiane, Lao PDR
MRC 2006 BDP Completion Report for Phase 1, Mekong River Commission, Vientiane, Lao PDR
MRC 2009 BDP Scenario Assessment framework Methodology overview charts, Mekong River Commission, Vientiane, Lao PDR
MRC 2009 BDP scenarios assessment methodology - Annex 1 hydrological assessment, Mekong River Commission, Vientiane, Lao PDR
MRC 2009 BDP scenarios assessment methodology - Annex 2 environmental assessment, Mekong River Commission, Vientiane, Lao PDR
MRC 2009 BDP scenarios assessment methodology - Annex 3 social assessment, Mekong River Commission, Vientiane, Lao PDR
MRC 2009 BDP scenarios assessment Methodology - Annex 4 economic assessment, Mekong River Commission, Vientiane, Lao PDR
MRC 2009 BDP scenarios assessment methodology - Annex 5 fisheries assessment, Mekong River Commission, Vientiane, Lao PDR
MRC 2009 BDP scenarios assessment methodology - Main Report, Mekong River Commission, Vientiane, Lao PDR
MRC 2009 BDP scenarios assessment Technical Note 1- Scoping and Planning of basin-wide scenario assessment, Mekong River Commission, Vientiane, Lao PDR
MRC 2009 BDP scenarios assessment Technical Note 10- Impacts on the Tonle Sap Ecosystem, Mekong River Commission, Vientiane, Lao PDR
MRC 2009 BDP scenarios assessment Technical Note 11- Impacts on Fisheries, Mekong River Commission, Vientiane, Lao PDR
MRC 2009 BDP scenarios assessment Technical Note 12- Social Impacts, Mekong River Commission, Vientiane, Lao PDR
MRC 2009 BDP scenarios assessment Technical Note 13-Economic Benefits and Costs, Mekong River Commission, Vientiane, Lao PDR
MRC 2009 BDP scenarios assessment Technical Note 2- Assessment Methodologies, Mekong River Commission, Vientiane, Lao PDR
MRC 2009 BDP scenarios assessment Technical Note 3- Assessment of Flow Changes Hydrological Assessment, Mekong River Commission, Vientiane, Lao PDR
MRC 2009 BDP scenarios assessment Technical Note 4- Impacts on River Morphology, Mekong River Commission, Vientiane, Lao PDR
MRC 2009 BDP scenarios assessment Technical Note 5- Impacts on Water Quality, Mekong River Commission, Vientiane, Lao PDR
MRC 2009 BDP scenarios assessment Technical Note 6- Power Benefits, Mekong River Commission, Vientiane, Lao PDR
MRC 2009 BDP scenarios assessment Technical Note 7- Agricultural Impacts, Mekong River Commission, Vientiane, Lao PDR
MRC 2009 BDP scenarios assessment Technical Note 8- Impacts of Changes in Salinity Intrusion, Mekong River Commission, Vientiane, Lao PDR
MRC 2009 BDP scenarios assessment Technical Note 9- Impacts on Wetlands and Biodiversity, Mekong River Commission, Vientiane, Lao PDR
MRC 2009 BDP2 Regional Hydropower Sector Review, Mekong River Commission, Vientiane, Lao PDR
MRC 2009 Preliminary DG of LMB Mainstream dams Final Version-Sept09, Mekong River Commission, Vientiane, Lao PDR
MRC 2010 Multi-functionality of paddy fields over the Lower Mekong Basin MRC Technical Report No 26, Mekong River Commission, Vientiane, Lao PDR
MRC 2010 State of the Basin Report, Mekong River Commission, Vientiane, Lao PDR
MRC 2010 Water Quality Report Card 2010 EP, Mekong River Commission, Vientiane, Lao PDR
MRC 2011 BDP Basin Development Strategy 2011-2015, Mekong River Commission, Vientiane, Lao PDR
MRC 2011 PNPCA Proposed Xayaburi dam project, Mekong River Commission, Vientiane, Lao PDR
MRC 2011-03-24-Report-on-Stakeholder-Consultation-on-Xayaburi, Mekong River Commission, Vientiane, Lao PDR
MRC 2012 Knowledge-base-benefit-sharing-vol1, Mekong River Commission, Vientiane, Lao PDR
MRC 2013 ISH01 Final Draft Inception Report, Mekong River Commission, Vientiane, Lao PDR
MRC 2013 ISH02-IR-Draft-Final-Inception-Report, Mekong River Commission, Vientiane, Lao PDR
MRC 2013 ISH11 Phase 1 Aquatic Ecology Annex stubauer, Mekong River Commission, Vientiane, Lao PDR
MRC 2013 ISH11 Phase 1 Data Management Annex FL, Mekong River Commission, Vientiane, Lao PDR
MRC 2013 ISH11 Phase 1 Hydrology Annex, Mekong River Commission, Vientiane, Lao PDR
MRC 2013 ISH11 Phase 1 Sediments & Geomorphology Annex, Mekong River Commission, Vientiane, Lao PDR
MRC 2013 ISH11 Phase 1 Socio-Economics Annex, Mekong River Commission, Vientiane, Lao PDR
MRC 2013 ISH11 Phase 1 Water Quality Annex, Mekong River Commission, Vientiane, Lao PDR
MRC 2013 ISH13 Benefit Sharing Options for Hydropower on Mekong Tributaries Regional Synthesis Draft, Mekong River Commission, Vientiane, Lao PDR
MRC 2013 PMFM Comprehensive Information Report, Mekong River Commission, Vientiane, Lao PDR
MRC 2011 ISH11 Phase 1 Report_Main Report_Final, Mekong River Commission, Vientiane, Lao PDR
Muir 2010 Tributary Significance Study - HYDROPOWER, Mekong River Commission, Vientiane, Lao PDR
Nesbitt 2003 Lower Mekong Basin Future trends in agricultural production, Mekong River Commission, Vientiane, Lao PDR
Nguyen etal 2010 BDP Scenarios Technical Report Support BDP2, Mekong River Commission, Vientiane, Lao PDR
Nguyen etal 2013 DSF working paper, Mekong River Commission, Vientiane, Lao PDR
Piman etal 2013 Assessment of hydrological changes in the lower, Mekong Basin Mekong River Commission, Vientiane, Lao PDR
POE 2010 Review of MRC BDP Programme phase 2 2010 Final Report, Mekong River Commission, Vientiane, Lao PDR
Saarkkula etal 2010 Origin fate and role of Mekong sediments, Mekong River Commission, Vientiane, Lao PDR
Sarkkula and Koponen 2010 Indicator and SocioEconomics report, Mekong River Commission, Vientiane, Lao PDR
Sarkkula etal 2010 IWRM modelling report, Mekong River Commission, Vientiane, Lao PDR
Schmultz and Mielach 2013 Review of existing research on fish passage through large dams qne its applicability to Mekong mainstream dams, Mekong River Commission, Vientiane, Lao PDR
van Zalinge etal 2003 The Mekong River System, Mekong River Commission, Vientiane, Lao PDR
Vogel 2012 Final Draft Synthesised Significant Tributaries Study, Mekong River Commission, Vientiane, Lao PDR
Williams 2011 Data collection and spatial analysis of significant tributaries for NAVIGATION, Mekong River Commission, Vientiane, Lao PDR
Literature Review - Priority External Documents
Fredén, F., n.d. Impacts of dams on lowland agriculture in the Mekong River catchment.